Primary Education Archives - Chavez-Grieves Consulting Engineers https://cg-engrs.com/portfolio_category/primary-education/ The Engineering Firm of Choice Wed, 19 Sep 2018 17:52:56 +0000 en-US hourly 1 https://wordpress.org/?v=6.3.5 Atrisco Heritage Academy https://cg-engrs.com/portfolio/atrisco-heritage-academy/ https://cg-engrs.com/portfolio/atrisco-heritage-academy/#respond Fri, 29 Jun 2018 09:37:02 +0000 https://cg-engrs.com/?post_type=avada_portfolio&p=4044 Atrisco Heritage Academy Albuquerque, New Mexico Construction Cost: $116M   Size: 460,000sf    460,000 square foot high school for Albuquerque public schools Campus included: Three gymnasiums Performing Arts Center Black Box theater Classrooms to support 2,200 students Decentralized food service facilities to support cafe style dining Multipurpose academy tech labs structured to [...]

The post Atrisco Heritage Academy appeared first on Chavez-Grieves Consulting Engineers.

]]>

Atrisco Heritage Academy
Albuquerque, New Mexico

  • atrisco heritage

Construction Cost: $116M   Size: 460,000sf   

  • 460,000 square foot high school for Albuquerque public schools
  • Campus included:
    • Three gymnasiums
    • Performing Arts Center
    • Black Box theater
    • Classrooms to support 2,200 students
    • Decentralized food service facilities to support cafe style dining
    • Multipurpose academy tech labs structured to flexibly house career path teaching facilities
    • Media center
    • Administrative offices
    • Community health clinic
    • Elective specific classrooms including ceramics, drama and ROTC
    • Full play fields to support baseball, soccer, football, track tennis and softball programs
  • Opened in two phases
  • Phase 1 housed a ninth-grade academy
  • Phase II housed the remaining school
  • Chavez-Grieves served as the engineer of record

The post Atrisco Heritage Academy appeared first on Chavez-Grieves Consulting Engineers.

]]>
https://cg-engrs.com/portfolio/atrisco-heritage-academy/feed/ 0
Volcano Vista High School https://cg-engrs.com/portfolio/volcano-vista-high-school/ https://cg-engrs.com/portfolio/volcano-vista-high-school/#respond Fri, 29 Jun 2018 09:30:36 +0000 https://cg-engrs.com/?post_type=avada_portfolio&p=4042 Volcano Vista High School Albuquerque, New Mexico Construction Cost: $100M   Size: 450,000sf    High school for grades nine through twelve, for 2,200 students Approximately 450,000 square feet of building on a 50-acre site Project included a master plan for 70 acres to include other community fields and recreational facilities Fast-tracked [...]

The post Volcano Vista High School appeared first on Chavez-Grieves Consulting Engineers.

]]>

Volcano Vista High School
Albuquerque, New Mexico

Construction Cost: $100M   Size: 450,000sf   

  • High school for grades nine through twelve, for 2,200 students
  • Approximately 450,000 square feet of building on a 50-acre site
  • Project included a master plan for 70 acres to include other community fields and recreational facilities
  • Fast-tracked to provide occupancy in less than two years
  • Two-story building and the adjacent athletic fields step slightly with the site
  • Commons areas are distributed along a central circulation element, providing space for student gathering and food service
  • Exterior of the building has a stucco skin, deep-set windows with shading devices/ light shelves, and a light-reflecting membrane roofing system
  • Main entrance is accentuated by locating it on the second level, at the end of a long gradual slope up. The main entrance leads into the two-level Learning Resource Center, which element adds to a strong design focus for the main entrance
  • Structure is a steel framing system
  • Chavez-Grieves Consulting Engineers was the structural engineer on the first phase of this project

The post Volcano Vista High School appeared first on Chavez-Grieves Consulting Engineers.

]]>
https://cg-engrs.com/portfolio/volcano-vista-high-school/feed/ 0
V. Sue Cleveland High School https://cg-engrs.com/portfolio/v-sue-cleveland-high-school/ https://cg-engrs.com/portfolio/v-sue-cleveland-high-school/#respond Fri, 29 Jun 2018 09:26:27 +0000 https://cg-engrs.com/?post_type=avada_portfolio&p=4040 V. Sue Cleveland High School Rio Rancho, New Mexico Construction Cost: $113M   Size: Mixed    High school campus located in Rio Rancho Project had three major areas: a three-story “tower” classroom building, a series of stand-alone, single-level structures, and a stand-alone, two-level gymnasium/locker room building Site also included a full complement [...]

The post V. Sue Cleveland High School appeared first on Chavez-Grieves Consulting Engineers.

]]>

V. Sue Cleveland High School
Rio Rancho, New Mexico

  • v. sue cleveland

Construction Cost: $113M   Size: Mixed   

  • High school campus located in Rio Rancho
  • Project had three major areas: a three-story “tower” classroom building, a series of stand-alone, single-level structures, and a stand-alone, two-level gymnasium/locker room building
  • Site also included a full complement of athletic fields and support facilities
  • Classroom building was approximately 200,000 square feet in size
  • Roof structure consisted of structural metal deck over structural steel joists
  • Elevated floor structures consisted of concrete over composite metal deck and steel beams
  • Structural steel frame supports the roof and floor
  • Winner of the a NAIOP NEW MEXICO Awards of Excellence Award of Merit for an Educational/High School, Associated General Contractors New Mexico Best Building Award for a CMAR Project, and ENR Southwest Best of Award for Best Cultural/Workshop Project for the Fine Arts Center and Orchestra Hall

The post V. Sue Cleveland High School appeared first on Chavez-Grieves Consulting Engineers.

]]>
https://cg-engrs.com/portfolio/v-sue-cleveland-high-school/feed/ 0